PanelWrapSquares of siding from the walls you actually have.

How much siding for a 2000 square foot 2-storey house

2,000 ft² footprint, 2 storeys
32.5squares to order
2,805 ft² of wall after openings, plus 15% waste for a average house
2,000 ft² footprint, 2 storeys32.5 squaresSiding to order2,805 ft²Net wall area
Siding to order1 square = 100 ft²32.5squares
Net wall area3,300 ft² gross less 15% for doors and windows2,805ft²
Perimeter assumedmeasure yours — an L-shaped house is 15–30% more for the same footprint183ft
Waste allowancethe usual mix of corners, gables and windows15%
J-channelaround every opening and where siding meets the roof246linear ft
Outside corner posts72linear ft

Notes

  • Measure your own perimeter before ordering. The 183 ft above assumes a tidy rectangle about 1.5 times as long as it is wide. An L-shaped or U-shaped house of the same 2,000 ft² has 15 to 30% more wall — and the error runs in the direction that leaves you short on the last day.
  • The 15% deduction for openings is an average, not your house. A wall of glass on the south elevation, or a house with very few windows, moves it several points either way. If accuracy matters, measure each opening and subtract properly: siding is ordered by the square and the offcuts are not returnable.
  • Waste is not padding. Every course has to start and stop at a corner or an opening, and the offcut is usually too short to use elsewhere. A 15% allowance on a average house is normal; gables are the worst because every course is a different length and the angle cut wastes the end.
  • Order the trim at the same time. J-channel, corner posts, starter strip, undersill and utility trim are separate items, they are colour-matched to a specific production run, and a later top-up can arrive visibly different. Roughly 246 ft of J-channel and 72 ft of corner post for this house.
  • Order everything in one lot number. Colour varies between production runs, and on a large elevation the difference is visible in daylight. This is the single most common regret on a siding job and it costs nothing to avoid.
  • Gables are extra and this figure does not include them. A gable end adds roughly half the width times the rise. On a steep roof over a wide house that is easily another square or two, and it is the part most often left out of a quantity take-off.

32.5 squares, and the perimeter is the assumption to check

Siding is sold by the square — 100 ft² — and the chain from your floor area to that number runs:

perimeter 183 ft → wall 2,805 ft² after taking off average house% for openings → 32.5 squares with waste.

That perimeter assumes a tidy rectangle about one and a half times as long as it is wide. An L-shaped or U-shaped house of the same footprint has 15 to 30% more wall, and the error runs in the direction that leaves you short on the last day. Measure yours.

Waste is not padding

Every course starts and stops at a corner or an opening, and the offcut is usually too short to use elsewhere. Gables are the worst: each course is a different length and the angled cut wastes the end.

Order the trim in the same lot

J-channel, corner posts, starter strip, undersill and utility trim are separate items, colour-matched to a production run. A later top-up can arrive visibly different in daylight, and on a large elevation that is the regret people mention years later.

Roughly 246 ft of J-channel and 72 ft of corner post for a house this shape.

Gables are extra, and this figure does not include them

A gable end adds about half its width times its rise. On a steep roof over a wide house that is easily another square or two — and it is the part left out of most take-offs.

Nearby sizes

Read more